Neolium Line 200/250 And 300 7.00M Platform Assembly - TUBESCA-COMABI NEOLIUM C 200 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 136

2-7. NEOLIUM LINE 200/250 and 300 7.00m platform assembly

• Closely follow the whole of §2-5 to assemble the NEOLIUM 200/250 and 300 5m platform.
• For the 7m platform and above, the stabiliser + extension set replaces the standard stabilisers.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform with the hatch on rung no. 27 by following § 2-1-6.
• Mount the 4 braces on rungs no. 29, and then no. 31, by following § 2-1-8.
• Position the toeboards by following § 2-1-8.
Collar clamp position:
nd
Between the 2
and 3
th
rungs, and the 14
rungs
106-A000035565 - ind.D - 11/2021
rd
th
and 15
69

Publicidad

Tabla de contenido
loading

Tabla de contenido