Neolium Line 200/250 And 300 3.00M Platform Assembly - TUBESCA-COMABI NEOLIUM C 200 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 136

2-2. NEOLIUM LINE 200/250 and 300 3.00m platform assembly

• Assemble the castor wheels by following §2-1-1.
• Assemble the braces by following §2-1-2.
• Mount the access cradle by following §2-1-4.
• Mount the platform on rung no. 3 by following §2-1-6.
• Mount the braces on rungs no. 5, and then no. 7, by following §2-1-7.
• Position the toeboards by following § 2-1-8.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform on rung no. 11 by following §2-1-6.
• Mount the braces on rungs no. 15, and then no. 13, by following §2-1-7.
• Position the toeboards by following § 2-1-8.
106-A000035565 - ind.D - 11/2021
66

Publicidad

Tabla de contenido
loading

Tabla de contenido