2-1-9. Assembling the stabilisers
• The 4 stabilisers are attached to the uprights between the 1
st
nd
th
and 2
rungs, and the 10
and
th
11
rungs.
• Lock the stabiliser clamp on to the upright using a wing nut.
• Repeat steps 1 and 2 a further 4 times.
Ensure that the clamp
is locked in place
C.
1
2
3
Ensure that
the clamp
is locked in
place
Check "length" and "width" according to table §3-8-2 by following table §2-8-2 for
NEOLIUM 200-250 and 300 and table §2-8-3 for NEOLIUM 400 and 600.
106-A000035565 - ind.D - 11/2021
65