SPALDING IN-GROUND BASKETBALL SYSTEM Manual Del Usuario página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assemble and Set the Anchor Plate
A
INSTALL THE PLATE
5. Fill remainder of hole with concrete.
6. Tamp down concrete to release air pockets and build drainage hill, about 1" above the playing
surface.
1" (2 .54 cm)
7. Insert the plate assembly (2) into the wet
cement.
8. Use the two plane bubble level to orient
and level the plate.
9. Clean off any excess cement on mounting
plate.
Drainage hill
Playing surface
FRONT
(toward
playing
surface)
12
BACK
#2
Playing surface
#2

Publicidad

Tabla de contenido
loading

Productos relacionados para SPALDING IN-GROUND BASKETBALL SYSTEM

Tabla de contenido