Assembly Of Second Tank - Graf one2clean Manual Del Usuario

Ocultar thumbs Ver también para one2clean:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.3

Assembly of second tank

13.
Install overflow baffle as in first tank.
15.
Assemble the Carat S tank as described in the in-
stallation instructions (seal, centring pins, clips,
position upper shell).
17.
Slide sludge return pipe from inside through the
hole for the sludge return.
4. Fitting the installation kit
Fit the retaining clips centrally on the last base rib.
Fit pipe aerator(s) as for the first tank. To attach
the cord, the hook is fastened to the telescopic
dome shaft.
Insert sludge return into tank.
20 / 52
14.
16.
18.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

106854106855106856106857

Tabla de contenido