5 LCS Tool
Figure 5.8 LCS tool - list of all inverters connected to the Inverter
Manager
12. If sufficient PV power is present and the grid code
conditions are met, the inverters are connected to the
grid.
13. During commissioning it is possible to download a
commissioning report in the Reports menu. The report
contains information about inverter settings, including
actual disconnection values for each inverter.
See figure 5.9.
Figure 5.9 LCS tool - commissioning report
16
IMVIOBOX-IA-xx-11
SMA Solar Technology AG / SMA Solar Technology America LLC
Installation Manual