3D. System Shut-Down
The following sequence of steps must be followed for servicing or
for storage.
1. Disconnect the power to the ozone generator.
2. After the generator has been shut down, the pool water
circulation pump may be turned off.
3. If the system is to be shut down for an extended period,
disconnect the Ozone Tube from the unit.
3E. Water Chemistry
Regular chlorine or bromine testing should be performed as
normal. Ozone will be eliminating the majority of contaminants.
Therefore, only a small amount of chemicals will need to be added
- just enough to maintain a minimum of residual level of 0.5 - 1.0
ppm chlorine or 1.0 - 2.0 ppm bromine. Ozone is pH neutral thus
minimizing pH adjustments.
SECTION 4. Maintenance
4A. System Electromechanical Overview
Power Supply
Mouting Screws
Power Supply
Bracket
Fuse Holder
Grounding
Lugs
Figure 4: Eclipse Overview
Eclipse Installation & Operations Manual
Manifold
Ozone Module
Terminal Block
Ozone Outlet
Barb
7
Power Supply Connecter